Project PJM-AH1-274 — Project Summary

Queue ID
PJM-AH1-274
Capacity
16.7 MW
Technology
Solar
Status
active
Location
Gloucester, NJ
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-274

PJM-AH1-274BetaActiveSolarPJMLBNL

16.7 MW generation in Gloucester, NJ · In queue since September 2021 · Proposed COD December 2022

16.7 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

1y 3m

Schedule

41 months past proposed COD

In Study38%
Queue EntrySep 9, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-12-23

About

PJM-AH1-274 is a proposed solar generation project with a total capacity of 16.7 MW, located in Gloucester County, New Jersey. The project is in the PJM interconnection queue as of September 9, 2021, with a proposed commercial operation date of December 23, 2022. The interconnection agreement (IA) status is listed as "In Progress (unknown study)".

The project, which interconnects to the Butler 69 kV point of interconnection, is being managed within the AEC utility territory. The developer is not specified in the available data. The project has appeared in recent news coverage regarding renewable energy projects in the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Gloucester

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEC

Entity

PJM

Service Type

Point of Interconnection

Butler 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BUTL APS138 KV T1
POI Substation
Butler Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.