PJM-AH1-297
200 MW generation in Stark, IL · In queue since September 2021 · Proposed COD December 2025
200 MW
Capacity
1
Components
Wind
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 3m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AH1-297 is a proposed 200 MW wind generation project located in Stark County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is December 31, 2025.
The interconnection agreement status is currently listed as "In Progress (unknown study)". The designated point of interconnection (POI) is the Kewanee - E.D. Edwards 138 kV substation. The serving utility is ComEd.
Generated from interconnection queue and public data sources
State
IL
County
Stark
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Kewanee - E.D. Edwards 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-297