PJM-AH1-298
75 MW storage in Whitley, IN · In queue since September 2021 · Proposed COD December 2025
75 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 3m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AH1-298 is a proposed 75 MW battery storage project located in Whitley County, Indiana. The project, which consists of 75 MW of battery capacity, is in the PJM interconnection queue as of September 14, 2021, with a proposed commercial operation date of December 31, 2025. The interconnecting utility is AEP.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Twin Branch - Meridian 345 kV line.
Generated from interconnection queue and public data sources
State
IN
County
Whitley
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Twin Branch - Meridian 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- COLUMBIA138 KV T1
- POI Substation
- Meridian
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-298