PJM-AH1-321
54 MW storage in Miami, OH · In queue since September 2021 · Proposed COD December 2025
54 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 3m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AH1-321 is a proposed 54 MW battery storage project located in Miami County, Ohio. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021, with a proposed commercial operation date of December 31, 2025. The project's interconnection agreement status is currently listed as "In Progress (unknown study)".
The proposed project, which is being developed within the Dayton utility territory, consists entirely of battery storage. The point of interconnection is at the Eldean 138 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Miami
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dayton
Entity
PJM
Service Type
—
Point of Interconnection
Eldean 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ELDEAN1 138 KV BK-2
- POI Substation
- Eldean Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-321