Project PJM-AH1-321 — Project Summary

Queue ID
PJM-AH1-321
Capacity
54 MW
Technology
Battery
Status
active
Location
Miami, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-321

PJM-AH1-321BetaActiveBatteryPJMLBNL

54 MW storage in Miami, OH · In queue since September 2021 · Proposed COD December 2025

54 MW

Capacity

1

Components

Battery

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

4y 3m

Schedule

4 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

PJM-AH1-321 is a proposed 54 MW battery storage project located in Miami County, Ohio. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021, with a proposed commercial operation date of December 31, 2025. The project's interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed project, which is being developed within the Dayton utility territory, consists entirely of battery storage. The point of interconnection is at the Eldean 138 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Miami

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dayton

Entity

PJM

Service Type

Point of Interconnection

Eldean 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
ELDEAN1 138 KV BK-2
POI Substation
Eldean Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-321