Project PJM-AH1-337 — Project Summary

Queue ID
PJM-AH1-337
Capacity
75 MW
Technology
Solar+Battery
Status
active
Location
Randolph, IN
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-337

PJM-AH1-337BetaActiveSolarBatteryPJMLBNL

75 MW hybrid in Randolph, IN · In queue since September 2021 · Proposed COD September 2025

75 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

4 years

Schedule

7 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-09-30

About

PJM-AH1-337 is a proposed 75 MW hybrid solar and battery project located in Randolph County, Indiana. The project consists of 75 MW of solar generation. It is listed in the PJM interconnection queue as of September 10, 2021, with a proposed commercial operation date of September 30, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".

The project, which is in the interconnection queue of regional transmission organization PJM, is being developed within the service territory of utility AEP. The point of interconnection is the Randolph - Hodgin 138 kV substation. The project is currently listed as "active" in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Randolph

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Randolph - Hodgin 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HODGIN 69 KV T2
POI Substation
Hodgin

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.