PJM-AH1-338
180 MW generation in Lee, IL · In queue since September 2021 · Proposed COD November 2025
180 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 2m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-11-21
PJM-AH1-338 is a proposed solar generation project with a total capacity of 180 MW, located in Lee County, Illinois. The project is in the PJM interconnection queue, having entered on September 10, 2021, with a proposed commercial operation date of November 21, 2025. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
The proposed project is located within the ComEd utility territory. It consists of 180 MW of solar photovoltaic generation. The point of interconnection (POI) is at the New Sub S2354 138kV substation.
Generated from interconnection queue and public data sources
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
New Sub S2354 138kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-338