Project PJM-AH1-340 — Project Summary

Queue ID
PJM-AH1-340
Capacity
48.89 MW
Technology
Solar
Status
active
Location
Preston, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-340

PJM-AH1-340BetaActiveSolarPJMLBNL

48.89 MW generation in Preston, WV · In queue since September 2021 · Proposed COD May 2024

48.89 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 8m

Schedule

23 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-05-31

About

PJM-AH1-340 is a proposed solar generation project with a total capacity of 48.89 MW. The development is located in Preston County, West Virginia, and is interconnected within the PJM Interconnection region. The project, which is in the interconnection queue of utility APS, entered the queue on September 10, 2021, with a proposed commercial operation date of May 31, 2024.

The interconnection agreement (IA) status for PJM-AH1-340 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is Cheat Lake-Ruthbelle 138 kV. There has been recent news coverage of the project.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Preston

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Cheat Lake-Ruthbelle 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.