PJM-AH1-357
20 MW generation in Mckean, PA · In queue since September 2021 · Proposed COD September 2024
20 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-10
PJM-AH1-357 is a proposed solar generation project located in Mckean County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 20 MW, consists entirely of solar photovoltaic generation. The proposed commercial operation date is September 10, 2024.
The project entered the PJM interconnection queue on September 10, 2021, and its interconnection agreement status is currently listed as "In Progress (unknown study)". The interconnecting utility is PENELEC, and the point of interconnection is the Pierce Brook-Lewis Run 230kV line.
Generated from interconnection queue and public data sources
State
PA
County
Mckean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Pierce Brook-Lewis Run 230kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-357