PJM-AH1-359
20 MW generation in Mckean, PA · In queue since September 2021 · Proposed COD September 2024
20 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-10
PJM-AH1-359 is a proposed solar generation project with a total capacity of 20 MW, located in McKean County, Pennsylvania. The project is interconnected to the PENELEC utility via the Farmers Valley-Ridgeway 115kV point of interconnection.
The project is listed in the PJM interconnection queue with an entry date of September 10, 2021, and a proposed commercial operation date of September 10, 2024. Its interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
PA
County
Mckean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Farmers Valley-Ridgeway 115kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-359