PJM-AH1-361
50 MW storage in Woodford, IL · In queue since September 2021 · Proposed COD September 2024
50 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-10
PJM-AH1-361 is a proposed 50 MW battery storage project located in Woodford County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is September 10, 2024.
The interconnection agreement for PJM-AH1-361 is currently listed as "In Progress (unknown study)". The project is located within the ComEd utility territory and connects to the Minonk 345 kV point of interconnection.
Generated from interconnection queue and public data sources
State
IL
County
Woodford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Minonk 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.