PJM-AH1-377
186 MW generation in Prince Edward, VA · In queue since September 2021 · Proposed COD June 2025
186 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 9m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-01
PJM-AH1-377 is a proposed solar generation project with a total capacity of 186 MW. The project is located in Prince Edward County, Virginia, and is being developed within the Dominion service territory. It consists of 186 MW of solar photovoltaic generation.
The project is listed in the PJM interconnection queue with an entry date of September 10, 2021. Its proposed commercial operation date is June 1, 2025. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
VA
County
Prince Edward
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Clover- Farmville 230kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.