PJM-AH1-426A
32.3 MW storage in Nicholas, WV · In queue since September 2021 · Proposed COD December 2023
32.3 MW
Capacity
1
Components
Battery
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 3m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AH1-426A is a proposed 32.3 MW battery storage project located in Nicholas County, West Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 11, 2021. The proposed commercial operation date is December 31, 2023.
The interconnection agreement for the project with utility APS is currently listed as "In Progress (unknown study)". The point of interconnection is at the Jones Branch 138 kV substation.
Generated from interconnection queue and public data sources
State
WV
County
Nicholas
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Jones Branch 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Branch
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-426A