PJM-AH1-427
100 MW generation in KY · In queue since September 2021 · Proposed COD September 2026
100 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
5 years
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-01
PJM-AH1-427 is a proposed solar generation project located in Kentucky within the PJM Interconnection region. The project, with a total capacity of 100 MW, is being developed by EKPC. It consists of 100 MW of solar photovoltaic generation.
The project entered the PJM interconnection queue on September 10, 2021, with a proposed commercial operation date of September 1, 2026. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Tommy Gooch - Garrard County 69 kV substation.
Generated from interconnection queue and public data sources
State
KY
County
—
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Tommy Gooch - Garrard County 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.