Project PJM-AH1-466 — Project Summary

Queue ID
PJM-AH1-466
Capacity
600 MW
Technology
Solar
Status
active
Location
Boone, KY
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-466

PJM-AH1-466BetaActiveSolarPJMLBNL

600 MW generation in Boone, KY · In queue since September 2021 · Proposed COD December 2024

600 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

16 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

PJM-AH1-466 is a proposed solar generation project with a total capacity of 600 MW, located in Boone County, Kentucky. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is December 31, 2024. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".

The project is being developed within the American Electric Power (AEP) service territory. The point of interconnection (POI) is the Baker - Broadford 765 kV line. The project has appeared in recent news coverage regarding renewable energy development in the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Boone

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Baker - Broadford 765 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
FOOTHILL18 KV UNIT 5

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.