PJM-AH1-490
20 MW generation in Crawford, PA · In queue since September 2021 · Proposed COD July 2024
20 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 10m
Schedule
21 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-07-30
PJM-AH1-490 is a proposed solar generation project with a total capacity of 20 MW, located in Crawford County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is July 30, 2024.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is the Venango Junction - Cambridge Springs 34.5 kV line, and the interconnecting utility is PENELEC.
Generated from interconnection queue and public data sources
State
PA
County
Crawford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Venango Junction - Cambridge Springs 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- POI Substation
- CAMBRIDGE
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.