Waterford Solar 1 (PJM-AH1-491) — Project Summary

Queue ID
PJM-AH1-491
Capacity
20 MW
Technology
Solar
Status
active
Location
Erie, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

Waterford Solar 1

PJM-AH1-491BetaActiveSolarPJMLBNL

20 MW generation in Erie, PA · In queue since September 2021 · Proposed COD July 2024

20 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 10m

Schedule

21 months past proposed COD

In Study38%
Queue EntrySep 11, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-07-30

About

Waterford Solar 1 is a proposed 20 MW solar generation project located in Erie County, Pennsylvania. The project is in the PJM interconnection queue as entry AH1-491, with a queue entry date of September 11, 2021, and a proposed commercial operation date of July 30, 2024. The project's interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project is located within the PENELEC utility service area and interconnects to the Union City 34.5 kV point of interconnection. The developer is not specified in the available data. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Erie

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Union City 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Waterford Solar 1