PJM-AH1-526
80 MW hybrid in Carroll, OH · In queue since September 2021 · Proposed COD October 2025
80 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 1m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-31
PJM-AH1-526 is a proposed 80 MW hybrid solar and battery project located in Carroll County, Ohio. The project, which consists of 80 MW of solar capacity, is interconnected to the ATSI utility via the South Canton - Sammis 345 kV point of interconnection.
The project is currently active in the PJM interconnection queue, with an entry date of September 11, 2021, and a proposed commercial operation date of October 31, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OH
County
Carroll
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
South Canton - Sammis 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.