Project PJM-AH1-528 — Project Summary

Queue ID
PJM-AH1-528
Capacity
300.8 MW
Technology
Solar
Status
active
Location
Brunswick, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-528

PJM-AH1-528BetaActiveSolarPJMLBNL

300.8 MW generation in Brunswick, VA · In queue since September 2021 · Proposed COD March 2025

300.8 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

13 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-30

About

PJM-AH1-528 is a proposed solar generation project located in Brunswick County, Virginia, within the PJM Interconnection region. The project, with a total capacity of 300.8 MW, is being developed within Dominion's service territory. The project consists of 300.8 MW of solar photovoltaic generation.

The project entered the PJM interconnection queue on September 10, 2021, and has a proposed commercial operation date of March 30, 2025. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Rawlings 500kV substation.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Brunswick

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Rawlings 500kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
RAWLINGS500 KV 1BUCK
POI Substation
Rawlings Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.