Project PJM-AH1-537 — Project Summary

Queue ID
PJM-AH1-537
Capacity
178.5 MW
Technology
Solar+Battery
Status
active
Location
Highland, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-537

PJM-AH1-537BetaActiveSolarBatteryPJMLBNL

178.5 MW hybrid in Highland, OH · In queue since September 2021 · Proposed COD March 2025

178.5 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 11, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

The proposed PJM-AH1-537 project is a 178.5 MW hybrid solar and battery energy storage development project located in Highland County, Ohio. The project, which consists of 178.5 MW of solar capacity, is in the PJM interconnection queue as of September 11, 2021, with a proposed commercial operation date of March 1, 2025.

The interconnection agreement for the project with utility OVEC is currently listed as "In Progress (unknown study)". The point of interconnection is the Pierce - DOE X-530 345 kV line. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Highland

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

OVEC

Entity

PJM

Service Type

Point of Interconnection

Pierce - DOE X-530 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-537