Project PJM-AH1-538 — Project Summary

Queue ID
PJM-AH1-538
Capacity
241.5 MW
Technology
Solar+Battery
Status
active
Location
Van Wert, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-538

PJM-AH1-538BetaActiveSolarBatteryPJMLBNL

241.5 MW hybrid in Van Wert, OH · In queue since September 2021 · Proposed COD March 2025

241.5 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

PJM-AH1-538 is a proposed 241.5 MW hybrid solar and battery project located in Van Wert County, Ohio. The project, which consists of 241.5 MW of solar capacity, is interconnected within the PJM Interconnection queue. The queue entry date is September 10, 2021, with a proposed commercial operation date of March 1, 2025. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed project is located within the AEP utility territory and its point of interconnection is the East Lima - Haviland 138 kV line. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Van Wert

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

East Lima - Haviland 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-538