PJM-AH1-539
129.4 MW generation in Hardin, OH · In queue since September 2021 · Proposed COD March 2025
129.4 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 6m
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-01
PJM-AH1-539 is a proposed solar generation project with a total capacity of 129.4 MW, located in Hardin County, Ohio. The project is in the PJM interconnection queue, having entered on September 10, 2021, with a proposed commercial operation date of March 1, 2025. The interconnecting utility is AEP. Its interconnection agreement status is listed as "In Progress (unknown study)".
The development project consists solely of solar generation, with 129.4 MW of solar photovoltaic capacity. The point of interconnection (POI) is the South Kenton 138 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Hardin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
South Kenton 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MYSVL_EK138 KV LD_154
- POI Substation
- Kenton