Project PJM-AH1-539 — Project Summary

Queue ID
PJM-AH1-539
Capacity
129.4 MW
Technology
Solar
Status
active
Location
Hardin, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-539

PJM-AH1-539BetaActiveSolarPJMLBNL

129.4 MW generation in Hardin, OH · In queue since September 2021 · Proposed COD March 2025

129.4 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

PJM-AH1-539 is a proposed solar generation project with a total capacity of 129.4 MW, located in Hardin County, Ohio. The project is in the PJM interconnection queue, having entered on September 10, 2021, with a proposed commercial operation date of March 1, 2025. The interconnecting utility is AEP. Its interconnection agreement status is listed as "In Progress (unknown study)".

The development project consists solely of solar generation, with 129.4 MW of solar photovoltaic capacity. The point of interconnection (POI) is the South Kenton 138 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Hardin

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

South Kenton 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MYSVL_EK138 KV LD_154
POI Substation
Kenton

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-539