PJM-AH1-540
165 MW generation in Ogle, IL · In queue since September 2021 · Proposed COD March 2025
165 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 6m
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-01
PJM-AH1-540 is a proposed solar generation project with a total capacity of 165 MW. The project is located in Ogle County, Illinois, within the ComEd service area and the PJM Interconnection region. The project entered the PJM queue on September 10, 2021, with a proposed commercial operation date of March 1, 2025.
The interconnection agreement for PJM-AH1-540 is currently listed as "In Progress (unknown study)". The point of interconnection is the Byron to Wayne 345 kV line. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
IL
County
Ogle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Byron to Wayne 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-540