Project PJM-AH1-541 — Project Summary

Queue ID
PJM-AH1-541
Capacity
92.4 MW
Technology
Solar
Status
active
Location
Dewitt, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-541

PJM-AH1-541BetaActiveSolarPJMLBNL

92.4 MW generation in Dewitt, IL · In queue since September 2021 · Proposed COD March 2025

92.4 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

PJM-AH1-541 is a proposed solar generation project with a total capacity of 92.4 MW, located in Dewitt County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is March 1, 2025. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The project, which falls within the ComEd utility territory, consists of 92.4 MW of solar photovoltaic generation. The point of interconnection is the Chestnut 345 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Dewitt

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Chestnut 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HOLLOFIE13 KV TWO
POI Substation
Chestnut Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.