Project PJM-AH1-543 — Project Summary

Queue ID
PJM-AH1-543
Capacity
157.4 MW
Technology
Solar
Status
active
Location
Livingston, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-543

PJM-AH1-543BetaActiveSolarPJMLBNL

157.4 MW generation in Livingston, IL · In queue since September 2021 · Proposed COD March 2025

157.4 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 11, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

PJM-AH1-543 is a proposed solar generation project with a total capacity of 157.4 MW. The project is located in Livingston County, Illinois, within the ComEd service area and the PJM Interconnection region. It entered the PJM queue on September 11, 2021, and has a proposed commercial operation date of March 1, 2025. The interconnection agreement is currently listed as "In Progress (unknown study)".

The development project consists solely of solar photovoltaic generation, with the full 157.4 MW capacity attributed to solar. The point of interconnection is the Powerton - Katydid Road 345 kV line.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Livingston

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Powerton - Katydid Road 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-543