Project PJM-AH1-545 — Project Summary

Queue ID
PJM-AH1-545
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Washington, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-545

PJM-AH1-545BetaActiveSolarBatteryPJMLBNL

200 MW hybrid in Washington, PA · In queue since September 2021 · Proposed COD March 2025

200 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

14 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-01

About

The proposed project PJM-AH1-545 is a 200 MW solar and battery hybrid development in Washington County, Pennsylvania. The project consists of 200 MW of solar generation, paired with an unspecified amount of battery storage. It is located within the PJM Interconnection region and is being managed by APS.

The project entered the PJM interconnection queue on September 10, 2021, with a proposed commercial operation date of March 1, 2025. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is at the Wylie Ridge-Tidd 345kV substation.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Washington

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Wylie Ridge-Tidd 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-545