Project PJM-AH1-552 — Project Summary

Queue ID
PJM-AH1-552
Capacity
670.2 MW
Technology
Solar+Battery
Status
active
Location
Prince George's, MD
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-552

PJM-AH1-552BetaActiveSolarBatteryPJMLBNL

670.2 MW hybrid in Prince George's, MD · In queue since September 2021 · Proposed COD June 2025

670.2 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 9m

Schedule

11 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-06-01

About

PJM-AH1-552 is a proposed 670.2 MW hybrid solar and battery project located in Prince George's County, Maryland. The project, interconnecting to PEPCO via the Chalk Point 230 kV point of interconnection, consists of 670.2 MW of solar generation. It is currently active in the PJM interconnection queue, with an entry date of September 10, 2021, and a proposed commercial operation date of June 1, 2025.

The interconnection agreement for PJM-AH1-552 is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

MD

County

Prince George's

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PEPCO

Entity

PJM

Service Type

Point of Interconnection

Chalk Point 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SMECO 13 KV SMECO
POI Substation
Chalk Point Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.