Project PJM-AH1-563 — Project Summary

Queue ID
PJM-AH1-563
Capacity
250 MW
Technology
Battery
Status
active
Location
IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-563

PJM-AH1-563BetaActiveBatteryPJMLBNL

250 MW storage in IL · In queue since September 2021 · Proposed COD June 2025

250 MW

Capacity

1

Components

Battery

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 9m

Schedule

11 months past proposed COD

In Study38%
Queue EntrySep 11, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-06-01

About

PJM-AH1-563 is a proposed 250 MW battery storage project located in Illinois within the ComEd service area. The project, which consists entirely of battery storage, entered the PJM interconnection queue on September 11, 2021, with a proposed commercial operation date of June 1, 2025.

The interconnection agreement for PJM-AH1-563 is currently listed as "In Progress (unknown study)". The point of interconnection is at the Aurora E.C. 138kV substation.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Aurora E.C. 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-563