Project PJM-AH1-570 — Project Summary

Queue ID
PJM-AH1-570
Capacity
25 MW
Technology
Solar
Status
active
Location
KY
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-570

PJM-AH1-570BetaActiveSolarPJMLBNL

25 MW generation in KY · In queue since September 2021 · Proposed COD December 2024

25 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

17 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-01

About

PJM-AH1-570 is a proposed solar generation project located in Kentucky, within the PJM Interconnection region. The project, with a total capacity of 25 MW, consists entirely of solar photovoltaic generation. Its point of interconnection is the Millersburg 69 kV substation.

The project entered the PJM interconnection queue on September 10, 2021, and has a proposed commercial operation date of December 1, 2024. The interconnection agreement is currently listed as "In Progress (unknown study)". The interconnecting utility is EKPC.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

EKPC

Entity

PJM

Service Type

Point of Interconnection

Millersburg 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
WMILBURG69 KV LOAD1
POI Substation
West Millersburg Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.