PJM-AH1-580
200 MW generation in Harrison, OH · In queue since September 2021 · Proposed COD May 2025
200 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 8m
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-05-01
The proposed project PJM-AH1-580 is a 200 MW solar generation project located in Harrison County, Ohio. The project is interconnected to the PJM Interconnection queue, with an entry date of September 10, 2021, and a proposed commercial operation date of May 1, 2025. The interconnecting utility is AEP, and the point of interconnection is the Nottingham Switch 138 kV. The interconnection agreement status is listed as "In Progress (unknown study)".
The development project consists of 200 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM queue.
Generated from interconnection queue and public data sources
State
OH
County
Harrison
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Nottingham Switch 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-580