PJM-AH1-585
50 MW generation in Sussex, DE · In queue since September 2021 · Proposed COD December 2024
50 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-16
PJM-AH1-585 is a proposed solar generation project with a total capacity of 50 MW, located in Sussex County, Delaware. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is December 16, 2024.
The interconnection agreement (IA) status for PJM-AH1-585 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Nelson-Indian River 138kV line, and the interconnecting utility is DPL.
Generated from interconnection queue and public data sources
State
DE
County
Sussex
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Nelson-Indian River 138kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 955 RIVE16 KV RV-2
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH1-585