Project PJM-AH1-587 — Project Summary

Queue ID
PJM-AH1-587
Capacity
200 MW
Technology
Solar
Status
active
Location
Mckean, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-587

PJM-AH1-587BetaActiveSolarPJMLBNL

200 MW generation in Mckean, PA · In queue since September 2021 · Proposed COD December 2024

200 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

17 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-16

About

PJM-AH1-587 is a proposed solar generation project with a total capacity of 200 MW, located in McKean County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 10, 2021. The proposed commercial operation date is December 16, 2024.

The interconnection agreement (IA) status for PJM-AH1-587 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is at the Farmers Valley _x0013_ Ridgeway 115 kV line, and the interconnecting utility is PENELEC.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Mckean

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Farmers Valley _x0013_ Ridgeway 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
VALLEY4 230 KV SR_1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.