Project PJM-AH1-588 — Project Summary

Queue ID
PJM-AH1-588
Capacity
240 MW
Technology
Solar
Status
active
Location
Mckean, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-588

PJM-AH1-588BetaActiveSolarPJMLBNL

240 MW generation in Mckean, PA · In queue since September 2021 · Proposed COD December 2024

240 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 3m

Schedule

17 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-16

About

PJM-AH1-588 is a proposed solar generation project located in McKean County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 240 MW, consists entirely of solar photovoltaic generation. The queue entry date for PJM-AH1-588 is September 10, 2021, with a proposed commercial operation date of December 16, 2024. The project is interconnected with PENELEC at the Lewis Run - Pierce Brook 230 kV point of interconnection.

The interconnection status for PJM-AH1-588 is listed as "In Progress (unknown study)". The project is currently active in the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Mckean

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Lewis Run - Pierce Brook 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH1-588