Project PJM-AH1-617 — Project Summary

Queue ID
PJM-AH1-617
Capacity
200 MW
Technology
Solar
Status
active
Location
KY
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH1-617

PJM-AH1-617BetaActiveSolarPJMLBNL

200 MW generation in KY · In queue since September 2021 · Proposed COD September 2024

200 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3 years

Schedule

19 months past proposed COD

In Study38%
Queue EntrySep 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-30

About

PJM-AH1-617 is a proposed solar generation project located in Kentucky with a total capacity of 200 MW. The project is listed in the PJM interconnection queue as of September 10, 2021, with a proposed commercial operation date of September 30, 2024. The interconnecting utility is AEP.

The interconnection agreement status for PJM-AH1-617 is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Beaver Creek 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEAVERCR46 KV WHEELWRT
POI Substation
Bever Creek

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.