PJM-AH1-634
68 MW generation in Sussex, DE · In queue since September 2021 · Proposed COD December 2024
68 MW
Capacity
1
Components
Offshore Wind
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 3m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AH1-634 is a proposed 68 MW offshore wind generation project located in Sussex County, Delaware. The project, interconnected within the PJM Interconnection queue, entered the queue on September 13, 2021, with a proposed commercial operation date of December 31, 2024. The designated point of interconnection is Indian River 230kV I.
The interconnection agreement for PJM-AH1-634 is currently listed as "In Progress (unknown study)". The project is assigned to utility DPL within the PJM region.
Generated from interconnection queue and public data sources
State
DE
County
Sussex
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Indian River 230kV I
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- INDIANRI13 KV UNIT10
- POI Substation
- Indian River South Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.