Project PJM-AH2-001 — Project Summary

Queue ID
PJM-AH2-001
Capacity
3.6 MW
Technology
Other
Status
active
Location
Susquehanna, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-001

PJM-AH2-001BetaActiveOtherPJMLBNL + Live

3.6 MW generation in Susquehanna, PA · In queue since October 2021 · Proposed COD December 2023

3.6 MW

Capacity

1

Components

Other

4y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 2m

Schedule

28 months past proposed COD

In Study38%
Queue EntryOct 1, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

About

The proposed project PJM-AH2-001 is a 3.6 MW generation project of unspecified technology located in Susquehanna County, Pennsylvania. The project is interconnected to the PENELEC utility within the PJM Interconnection region. It entered the PJM queue on October 1, 2021, with a proposed commercial operation date of December 31, 2023. The interconnection agreement status is listed as "In Progress (unknown study)".

The point of interconnection for the project is named "Rattlesnake Hill Waste Heat Recovery", suggesting a possible link to existing infrastructure. Recent news coverage of the project may exist, given its active status in the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Susquehanna

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Rattlesnake Hill Waste Heat Recovery

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH2-001