14.234 MW generation in Pickaway, OH · In queue since October 2021 · Proposed COD June 2024
14.234 MW
Capacity
1
Components
Other
4y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 8m
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-01
PJM-AH2-006 is a proposed generation project located in Pickaway County, Ohio, within the PJM Interconnection region. The project, with a total capacity of 14.23 MW, utilizes an "Other" technology type. The queue entry date is October 4, 2021, with a proposed commercial operation date of June 1, 2024. The interconnection customer is unknown, and the interconnecting utility is AEP.
The project's interconnection status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Harrison - Good Hope 138 kV line. Recent news coverage of the project is unavailable.
Generated from interconnection queue and public data sources
State
OH
County
Pickaway
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Harrison - Good Hope 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- HARR APS20 KV GEN 1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-006