PJM-AH2-040
11.5 MW generation in Tucker, WV · In queue since November 2021 · Proposed COD December 2024
11.5 MW
Capacity
1
Components
Solar
4y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 1m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AH2-040 is a proposed solar generation project with a total capacity of 11.5 MW. The project is located in Tucker County, West Virginia, within the PJM Interconnection region. The queue entry date is November 13, 2021, with a proposed commercial operation date of December 31, 2024. The interconnecting utility is APS.
The project's interconnection status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
WV
County
Tucker
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
William - Blackwater 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- DEARINGT69 KV T1
- POI Substation
- Blackwater