PJM-AH2-041
18.89 MW generation in Monongalia, WV · In queue since November 2021 · Proposed COD December 2023
18.89 MW
Capacity
1
Components
Solar
4y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 1m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AH2-041 is a proposed solar generation project with a total capacity of 18.89 MW. The project is located in Monongalia County, West Virginia, within the PJM Interconnection region. The queue entry date is November 13, 2021, with a proposed commercial operation date of December 31, 2023. The interconnection customer is APS.
The project's interconnection status is listed as "In Progress (unknown study)". The point of interconnection is the Osage - Collins Ferry 23 kV line.
Generated from interconnection queue and public data sources
State
WV
County
Monongalia
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Osage - Collins Ferry 23 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.