Project PJM-AH2-069 — Project Summary

Queue ID
PJM-AH2-069
Capacity
250 MW
Technology
Solar
Status
active
Location
Wythe, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-069

PJM-AH2-069BetaActiveSolarPJMLBNL + Live

250 MW generation in Wythe, VA · In queue since January 2022 · Proposed COD May 2025

250 MW

Capacity

1

Components

Solar

4y 4m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 4m

Schedule

11 months past proposed COD

In Study38%
Queue EntryJan 13, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-05-30

About

PJM-AH2-069 is a proposed solar generation project located in Wythe County, Virginia, within the PJM Interconnection region. The project, with a total capacity of 250 MW, consists entirely of solar photovoltaic generation. The queue entry date for PJM-AH2-069 is January 13, 2022, with a proposed commercial operation date of May 30, 2025.

The interconnection status for PJM-AH2-069 is listed as "In Progress (unknown study)". The point of interconnection is the Jackson Ferry - Progress Park 138 kV line, and the interconnecting utility is AEP. The project is currently listed as active in the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Wythe

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

JAckson Ferry - Progress Park 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.