Project PJM-AH2-096 — Project Summary

Queue ID
PJM-AH2-096
Capacity
19.5 MW
Technology
Solar
Status
active
Location
Dorchester, MD
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-096

PJM-AH2-096BetaActiveSolarPJMLBNL + Live

19.5 MW generation in Dorchester, MD · In queue since February 2022 · Proposed COD May 2023

19.5 MW

Capacity

1

Components

Solar

4y 3m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

1y 3m

Schedule

37 months past proposed COD

In Study38%
Queue EntryFeb 1, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-05-01

About

PJM-AH2-096 is a proposed solar generation project located in Dorchester County, Maryland, within the PJM Interconnection region. The project, with a total capacity of 19.5 MW, consists entirely of solar photovoltaic generation. The designated utility for the project is DPL.

The project entered the PJM interconnection queue on February 1, 2022, with a proposed commercial operation date of May 1, 2023. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the West Cambridge - Airey 69 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

MD

County

Dorchester

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

DPL

Entity

PJM

Service Type

Point of Interconnection

West Cambridge - Airey 69 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
POI Substation
CAMBRIDGE

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.