Project PJM-AH2-116 — Project Summary

Queue ID
PJM-AH2-116
Capacity
85 MW
Technology
Solar
Status
active
Location
Cambria, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-116

PJM-AH2-116BetaActiveSolarPJMLBNL + Live

85 MW generation in Cambria, PA · In queue since February 2022 · Proposed COD January 2026

85 MW

Capacity

1

Components

Solar

4y 3m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 11m

Schedule

4 months past proposed COD

In Study38%
Queue EntryFeb 23, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-01-01

About

PJM-AH2-116 is a proposed solar generation project with a total capacity of 85 MW, located in Cambria County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, having entered the queue on February 23, 2022, with a proposed commercial operation date of January 1, 2026. The interconnection agreement is currently listed as "In Progress (unknown study)".

The proposed project, which will connect to the PENELEC utility grid at the Garman - Westover South 115 kV point of interconnection, consists solely of 85 MW of solar photovoltaic generation.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Cambria

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Garman - Westover South 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SOUTH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.