PJM-AH2-156
40 MW generation in Huron, OH · In queue since March 2022 · Proposed COD December 2025
40 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 9m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AH2-156 is a proposed 40 MW solar generation project located in Huron County, Ohio. The project is interconnected within the PJM Interconnection queue under queue ID PJM-AH2-156. The queue entry date is March 2, 2022, with a proposed commercial operation date of December 31, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project consists of 40 MW of solar photovoltaic generation. The designated point of interconnection (POI) is the Buckeye P-Wakeman 69 kV substation. The transmission utility is ATSI.
Generated from interconnection queue and public data sources
State
OH
County
Huron
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Buckeye P-Wakeman 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-156