PJM-AH2-228
150 MW storage in Pickaway, OH · In queue since March 2022 · Proposed COD December 2026
150 MW
Capacity
1
Components
Battery
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
PJM-AH2-228 is a proposed 150 MW battery storage project located in Pickaway County, Ohio. The project, which interconnects to the AEP utility via the Circleville 138 kV point of interconnection, entered the PJM interconnection queue on March 9, 2022. Its proposed commercial operation date is December 31, 2026.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
OH
County
Pickaway
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Circleville 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CIRCLEVI138 KV T1
- POI Substation
- Circleville Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.