PJM-AH2-239
49 MW hybrid in Trumbull, OH · In queue since March 2022 · Proposed COD March 2027
49 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5 years
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-07
The proposed project PJM-AH2-239 is a 49 MW hybrid solar and battery energy storage development in Trumbull County, Ohio. The project, located within the PJM Interconnection region and under the utility ATSI, consists of 49 MW of solar capacity.
The project entered the PJM queue on March 10, 2022, with a proposed commercial operation date of March 7, 2027. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Trumbull 138 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Trumbull
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Trumbull138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-239