PJM-AH2-241
45 MW storage in City Of Chesapeake, VA · In queue since March 2022 · Proposed COD March 2027
45 MW
Capacity
1
Components
Battery
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5 years
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-01
PJM-AH2-241 is a proposed 45 MW battery storage project located in the City Of Chesapeake, Virginia. The project is being developed within the Dominion service area and is interconnected to the PJM grid at the Loudoun 115kV point of interconnection.
The project entered the PJM interconnection queue on March 10, 2022, with a proposed commercial operation date of March 1, 2027. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
VA
County
City Of Chesapeake
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Loudoun 115kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MOSBY 500 KV BOOST1
- POI Substation
- Loudoun Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-241