Project PJM-AH2-258 — Project Summary

Queue ID
PJM-AH2-258
Capacity
172 MW
Technology
Solar+Battery
Status
active
Location
Kendall, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-258

PJM-AH2-258BetaActiveSolarBatteryPJMLBNL + Live

172 MW hybrid in Kendall, IL · In queue since March 2022 · Proposed COD September 2024

172 MW

Capacity

1

Components

Solar

4y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 6m

Schedule

19 months past proposed COD

In Study38%
Queue EntryMar 9, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-27

About

PJM-AH2-258 is a proposed 172 MW hybrid solar and battery project located in Kendall County, Illinois. The project consists of 172 MW of solar generation. It is interconnected within the PJM Interconnection queue, with an entry date of March 9, 2022, and a proposed commercial operation date of September 27, 2024. The interconnecting utility is ComEd, and the point of interconnection is the Plano 345 kV substation.

The project's interconnection agreement status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Kendall

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Plano 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
167 PLANO
POI Substation
Plano Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.