PJM-AH2-262
17 MW hybrid in Frederick, MD · In queue since March 2022 · Proposed COD March 2026
17 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
4 years
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-03-01
PJM-AH2-262 is a proposed 17 MW hybrid solar and battery energy storage project located in Frederick County, Maryland. The project, which consists of 17 MW of solar generation, is in the PJM interconnection queue as of March 10, 2022, with a proposed commercial operation date of March 1, 2026.
The interconnection request is currently listed as "In Progress (unknown study)" with utility APS. The point of interconnection is the Catoctin-Carroll 138 kV line.
Generated from interconnection queue and public data sources
State
MD
County
Frederick
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Catoctin-Carroll 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-262