PJM-AH2-289
79.6 MW storage in Fulton, OH · In queue since March 2022 · Proposed COD December 2024
79.6 MW
Capacity
1
Components
Battery
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AH2-289 is a proposed 79.6 MW battery storage project located in Fulton County, Ohio. The project is interconnected to the ATSI utility network within the PJM Interconnection region. The queue entry date for this project is March 10, 2022, with a proposed commercial operation date of December 1, 2024.
The interconnection agreement (IA) status for PJM-AH2-289 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the East Fayette 138 kV II substation.
Generated from interconnection queue and public data sources
State
OH
County
Fulton
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
East Fayette 138 kV II
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- E_FAYET 34.5 KV ARCHESP
- POI Substation
- East Fayette Substation