PJM-AH2-337
100 MW hybrid in Worcester, MD · In queue since March 2022 · Proposed COD February 2026
100 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 11m
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-02-27
PJM-AH2-337 is a proposed 100 MW hybrid solar and battery project located in Worcester County, Maryland. The project consists of 100 MW of solar generation and an unspecified amount of battery storage. It is interconnected within the PJM Interconnection queue, having entered the queue on March 10, 2022, with a proposed commercial operation date of February 27, 2026.
The interconnection agreement (IA) status for PJM-AH2-337 is listed as "In Progress (unknown study)". The designated point of interconnection (POI) is the Talbot 69 kV substation. The project is within the service territory of Delmarva Power & Light (DPL).
Generated from interconnection queue and public data sources
State
MD
County
Worcester
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Talbot 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- POI Substation
- London Talbot TS
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-337