Project PJM-AH2-340 — Project Summary

Queue ID
PJM-AH2-340
Capacity
350 MW
Technology
Solar
Status
active
Location
Stark, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-340

PJM-AH2-340BetaActiveSolarPJMLBNL + Live

350 MW generation in Stark, IL · In queue since March 2022 · Proposed COD July 2027

350 MW

Capacity

1

Components

Solar

4y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

5y 4m

In Study38%
Queue EntryMar 10, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-30

About

PJM-AH2-340 is a proposed solar generation project with a total capacity of 350 MW. The project is located in Stark County, Illinois, within the ComEd service area and the PJM Interconnection region. The project entered the PJM queue on March 10, 2022, and has a proposed commercial operation date of July 30, 2027.

The interconnection agreement for PJM-AH2-340 is currently in progress, with the specific study type unknown. The point of interconnection is the Toulon 138kV substation.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Stark

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Toulon 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH2-340